Boardman River Feasibility Study - Alternative 1 (Draft)
-
File:factsheetalt1.pdfDescription:DraftMIME type:application/pdfFile Size:389.1Kb
Abstract
This fact sheet is a summary of a detailed analysis of the alternative described below. The alternative was selected
by the Boardman River Dams Committee for detailed analysis along with five (5) other alternatives. The following
information is provided as a summary of the analysis of the alternative. Information on the existing conditions and
impacts of this alternative can be obtained by reviewing the complete report on the website. You may notice that the
description of the analysis of the alternative sometimes includes at the end of certain sentences an alphanumeric
code in parentheses. This code refers to the list of questions that was included in the Request for Proposals.