• Login
    View Item 
    •   DSpace Home
    • Northwestern Michigan College
    • Online Water Library (OWL)
    • View Item
    •   DSpace Home
    • Northwestern Michigan College
    • Online Water Library (OWL)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Boardman River Feasibility Study - Alternative 43 (Draft)

    • File:factsheetalt43.pdf
      Show File
      MIME type:application/pdf
      File Size:424.9 Kb

      factsheetalt43.pdf

      View/Open
    Thumbnail
    View/Open
    factsheetalt43.pdf (424.9 Kb)

    Date
    2008-09-10
    Author
    Environmental Consulting & Technology, Inc.
    Metadata
    Show full item record
    Subject
     Boardman River Dam Project; Alternative 43 
    Abstract
    This fact sheet is a summary of a detailed analysis of the alternative described below. The alternative was selected by the Boardman River Dams Committee for detailed analysis along with five (5) other alternatives. The following information is provided as a summary of the analysis of the alternative. Information on the existing conditions and impacts of this alternative can be obtained by reviewing the complete report on the website. You may notice that the description of the analysis of the alternative sometimes includes at the end of certain sentences an alphanumeric code in parentheses. This code refers to the list of questions that was included in the Request for Proposals.
    Description
    This option would consist of retaining Union Street Dam, along with the existing fish ladder and DNR weir operation. The fish ladder would be operated to allow salmonids to pass the dam, but invasive aquatic species would be blocked at the weir and Union Street. Sabin Dam would be removed completely to allow a free flowing river to be restored from Boardman Pond Dam to Boardman Lake. Boardman Pond would be modified to meet MDEQ requirements and the water level maintained at the water level prior to the drawdown. Gates and other water level controls will be used to provide flood control in Boardman Pond. The dams at Boardman Pond and Brown Bridge Pond will be modified to allow passage of Great Lakes fish, including salmon and trout. The Brown Bridge Dam will be modified to allow for cold water at the bottom of the impoundment to be discharged, which may mitigate the impact of warm water discharge into the Boardman River.
    URI
    http://hdl.handle.net/11045/10542
    Collections
    • Online Water Library (OWL)

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login
    DSpace software Copyright © 2015  Duraspace
    Contact Us | Send Feedback