Show simple item record

dc.contributor.authorEnvironmental Consulting and Technology, Inc.
dc.contributor.authorU.S. Army Corps of Engineers
dc.date.accessioned2009-10-10T13:14:51Z
dc.date.available2009-10-10T13:14:51Z
dc.date.issued2008-01
dc.identifier.urihttp://hdl.handle.net/11045/10671
dc.descriptionSections include: Introduction, Purpose Of This Report, Overall Project Regulatory History, Union St. Dam Inspection (Description Of Dam, Results of most recent Dam Safety Inspection (2005,) Onsite Observations From Joint Inspection, Impacts To Existing Operations (Conditions Without Project,) Potential Impacts To Breach/ Removal Of Union Dam, Potential Impacts To Construction Of A Fish Passage),) Sabin Dam Inspection (Description Of Dam, Results Of Most Recent FERC Operation Report (2006,) Onsite Observations From Joint Site Inspection, Impacts To Existing Operations (Conditions Without Project,) Potential Impacts To Breach/ Removal Of Sabin Dam, Potential Impacts To Construction Of A Fish Passage, and Potential Impacts To Rerouting River and Leaving Dam in Place),) Boardman (Pond) Dam Inspection (Description Of Dam, Results Of Most Recent FERC Operation Report (2006,) Onsite Observations From Joint Inspection, Impacts To Existing Operations (Conditions Without Project,) Potential Impacts To Breach/Removal Of Boardman Dam, and Potential Impacts To Construction Of A Fish Passage),) Brown Bridge Dam Inspection (Description Of Dam, Results of most recent FERC Operation Report (2006,) Onsite Observations From Joint Inspection, Impacts To Existing Operations (Conditions Without Project,) Potential Impacts To Breach/ Removal Of Brown Bridge Dam, and Potential Impacts To Construction Of A Fish Passage),) Summary (Spillway Capacities, Required Action for Conditions without Project, Recommendations (Union Street Dam, Sabin Dam, Boardman Dam, Brown Bridge Dam,) References, Boardman River Feasibility Study – Preliminary Engineering Evaluation of Existing Structures, Appendix A: Figures, Appendix B: Union Street Dam Photographs, Appendix C: Sabin Dam Photographs, Appendix D: Boardman Dam Photographs, Appendix E: Brown Bridge Dam Photographs, Appendix F: Acronyms & Definitionsen_US
dc.description.sponsorshipThe Grand Traverse Band of Ottawa and Chippewa Indians (GTB,) through a Tribal Wildlife Grant provided by the U.S. Department of Interior, Fish and Wildlife Service .en_US
dc.language.isoen_USen_US
dc.publisherBoardman River Dams Committeeen_US
dc.titleBoardman River Feasibility Study Preliminary Engineering Evaluation Of Existing Structures - Draften_US
dc.typeOtheren_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record