Show simple item record

dc.contributor.authorCarpenter, Michael D.
dc.date.accessioned2009-10-10T22:42:00Z
dc.date.available2009-10-10T22:42:00Z
dc.date.issued2008-09-17
dc.identifier.urihttp://hdl.handle.net/11045/10681
dc.descriptionSections include: Introduction, Conclusions & Recommendations (Immediate, Short-Term, and Long-Term,) Project Information (Available References, Project History and Purpose, and Project Description,) Field Inspection, Structural Stability (Embankments, Concrete Structures - Powerhouse / Spillway,) Hydrology and Hydraulics (Hydrology, Hydraulics,) Operations and Maintenance, Emergency Action Plan, Cost Estimates, Apprendix A - Project Location Map, Appendix B - Project Drawings (Topography of Dam Site [1921,] Brown Bridge Plan [1921,] Fish Chute Plan [1921,] Tainter Gate Plan [1921,] Steel Details [1921,] Powerhouse Details [1921,] Log Chute Details [1921,] Penstock & Spillway Details [1921,] Penstock & Spillway Details [1921,] Downstream Apron Embankment Walls [1921],) Appendix C - Photographs (29,) Appendix D - Hydrological Data, MDEQ Flood Discharge Request Record, Appendix E - Dam Inspection Checklist, Appendix F - Control Point Survey, Bathymetric Soundings, Piezometer and Weir Data, Appendix G - Dive Inspection Report and DVD, Appendix H - Embankment Stability Analyses, and Appendix I - Operational Scenario Sketches.en_US
dc.language.isoen_USen_US
dc.publisherBoardman River Dams Committeeen_US
dc.subjectBoardman River Damsen_US
dc.titleSafety Inspection of Brown Bridge Damen_US
dc.typeTechnical Reporten_US


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record