Now showing items 1-9 of 9

  • First Sampling Lake Bellaire Tributaries 

    Kelly, Thomas (2013-03-28)
    On 9 May 1983 I sampled Grass Creek, the Intermediate River at Bellaire and at its mouth at Lake Bellaire, and the Grass River at its head water at Lake Bellaire. (See map for sampling locations). Copies of my field notes ...
  • Phosphorus Results, 1983-1984 

    Kelly, Thomas (2013-03-28)
    The following is a summary of the phosphorus analyses done f or us by Prein and Newhof Laboratories in Grand Rapids. I have attched their original letter and result sheet to this memo.
  • Report of Lake Bellaire Sampling 

    Kelly, Thomas (2013-03-28)
    Results of field work done on June 14, 1984; July 16,1984; August 15, 1984; September 14,1984 on Lake Bellaire.
  • Results of Shanty Creek Area Streams, Third Sampling Antrim County, Nov. 1, 1983 

    Kelly, Thomas (2013-03-28)
    Field work by T. M. Kelly Sampling sites are the same as previous week unless noted. Sample for chemistry taken and frozen from each numbered site.
  • Results of the Lake Bellaire inflows and outflow, 9 June 1983 

    Kelly, Thomas (2013-03-26)
    I carried out sampling of Grass Creek, the Intermediate River, (two stations) and the Grass River on 9 June 1983. P. Peterson assisted with field work. A boat and motor was provided by Follo' s Marina of Bellaire. Water ...
  • Sampling of Lake Bellaire, 29 June 1983 

    Kelly, Thomas (2013-03-26)
    Attached to this memo are my field notes from yesterday’s sampling of Lake Bellaire. The phytoplankton sample is now on its way to Dr. Peter G. Meier of Ann Arbor for determination of algae species and relative abundance. ...
  • Shanty Creek Area Streams, First Sampling 

    Kelly, Thomas (2013-03-28)
    Attached are my notes and results from the first sampling of the Shanty Creek area streams. This sampling will be followed next week with another round of routine sampling and the first of the detailed stream descriptions.
  • Shanty Creek Streams Project, Second Sampling 

    Kelly, Thomas (2013-03-26)
    I made the second sampling of Shanty Creek area streams on Oct. 24 - 25 1983. A heavy rain occurred on Oct. 25 and Stream No. 1 (at the old RR depot) was very turbid. Others streams were not affected, at least when seen ...
  • Shanty Creek Streams Project, Second Sampling. October 28, 1983 

    Kelly, Thomas (2013-03-28)
    Visited Antrim County ASCS Office and Planning Department to look at Shanty Creek Site Development Plans. Plans showed detailed topography and locations of proposed sewer and sanitary sewer lines, sediment retention ponds ...