An Investigation of the Boardman River Biota in Response to Temporary Drought Conditions

Loading...
Thumbnail Image

Authors

Kelly, Thomas M.

Issue Date

2014-07-17

Type

Technical Report

Language

en_US

Subject

Grand Traverse County

Research Projects

Organizational Units

Journal Issue

Alternative Title

Abstract

On May 22, 1981, the Brown Bridge Dam spillway gates were accidentally closed and remained closed for approximately 1.5 hours. This closure stopped the discharge at Brown Bridge and lowered the downstream river level* exposing portions of the stream bottom to the air. This investigation was done to determine the effects of this temporary "drought" condition on the river’s benthic invertebrate fauna, with special consideration of fish food items. Item includes Addendum dated July 13, 1981.

Description

Citation

Publisher

License

Attribution-ShareAlike 2.0 Generic (CC BY-SA 2.0)

Journal

Volume

Issue

PubMed ID

DOI

ISSN

EISSN